Skip to product information
1 of 7

Intelline Performance

BMW B58/S58 Billet Intake Manifold

BMW B58/S58 Billet Intake Manifold

Regular price $5,799.00 CAD
Regular price Sale price $5,799.00 CAD
Sale Sold out
Shipping calculated at checkout.
Plenum Configuration

Total Price With Options

$5,799.00 CAD

PRE-ORDERS OPEN FOR FIRST BATCH - ESTIMATED DELIVERY OCTOBER 2026

The next soonest lead time after the first batch would be December 2026.

FEATURES

  • Supports 100psi boost pressure.
  • Lightweight 5-axis machined from 6061-T6 billet aluminum.
  • Assembly features our unique tab-rail system for convenient assembly and disassembly of the inlet plenum and dual-plenum transition slot. Also allows the design to be easily configured for an air-to-water intercooler instead of the dual-plenum.
  • 2000Hp capable plenum volume.
  • Optional dual injectors and/or 2nd fuel rail.
  • 4" V-band throttle inlet, with our billet v-band clamps and throttle body adapter to throttle of your choice.
  • Cable driven throttle assemblies possible.
  • Customizable with additional bungs for various nozzles. Reach out for special requests and we can make it happen.
  • Designed, manufactured, and assembled entirely in-house in Canada.

DESCRIPTION

A legendary engine platform needs a proper manifold to match. You've been asking for it and we've been cooking. The B58/S58 platform is a popular modern choice, with tuners and racers pushing the limits to absurd 4-digit hp numbers on stock internals. BMW did an impressive job with the guts, but a bulletproof intake manifold feeding the monster is needed for anyone chasing records. We've packed some very unique features into our layout are excited to bring Intelline Works technology to the inline-6 market. This design will support gen1 and gen2 engines, and is configurable for max effort builds running external intercoolers, OR as an integrated air-to-water intercooled intake.

EMISSIONS - CATEGORY 3

This product is not legal for street use on an
emissions-controlled vehicle. It may be used on
dedicated competition or pre-pollution-controlled
vehicles only.


 

View full details